Tile

The bathroom has received tile on the walls and floor and we're ready to install the interior polycarbonate and trim. The walls are a glossy 3x6 tile installed in a running bond pattern, and the floor is a 3x12 with a more matte finish. Next step is to install the fixtures. Stay tuned!

work on the tile

Completed floor tile with wall tile in progress.

 

finished tile

The completed tile job/Dave and Steve installing the polycarbonate.